Inside Jobs

This month has seen a lot of "inside jobs" - hardwood floors, tiling, interior doors, and such. And each new step makes it seem more like a house. We are having a blast!

One of our favorite features of the house is the stairway that John DeForest designed. It is located in the tall "box" to the left of the front door, and the entire stairwell is beautifully lit by windows on the upper floor.




There are temporary boards in place now, but the lovely design of the stairs can be seen already. Later, they will install the thicker oak treads which will have the dark stain of the rest of the hardwood floors.

Saturday, April 19, 2008

The Drywall Process






Last week, a drywall team came and nailed up all the drywall. Suddenly all the insulation, wires, and framing were covered. This week there is a team who are taping, mudding, and sanding the walls smooth. They have ingenious equipment to do all this, but my favorite are the adjustable stilts they walk on to reach the high spots!

By the time they are done there will be 5 layers of mud applied and smoothed on the walls and ceiling





Thursday, April 17, 2008

Feathering the nest


We're having fun again. Several different crews have been working at the nest this month. The first came in and installed the insulation. John DeForest referred to this as "feathering" the nest. It was the first time that some of the formerly "see-through" walls got definition and form. We could actually see "rooms". And it was amazing how quiet it made the house.

Monday, March 10, 2008

This past week we celebrated our two-year anniversary of working with DeForest Architects. Partnering with this architectural firm, headed by John DeForest, has been the best decision in the whole project. John is masterful at so many things - design, communication, process, life - and has been a wonderful architect for us. He's simply the best.
Much has happened at the house the past 6 weeks or so. The roof has been covered with a torchdown material, as has the upper deck, and all the windows are installed, including the lift-fold doors in the dining room - which look fantastic!







Outside, the exterior siding has been going up - both the Hardie paneling and the Hardie planks; the cedar siding will come a little later.






and inside, the plumbing, electrical and low-voltage rough-ins are all done. Paul and I have brought over two chairs and a little table so that we can have a cup of coffee in the mornings or a glass of wine in the evenings when the workers aren't there. A little bit of heaven.

Saturday, January 19, 2008

Views from the Nest

Although the framers had to work in some pretty cold and wet conditions in December and early January, there have been some gorgeous days this past week that have made our nest seem like an aerie.
the first two pictures show views from the main floor looking out the living room to the east and looking out the dining room to the deck
these next two pictures were taken from the upstairs deck - the south view of Mt. Rainier and the east view to Bellevue

looking north up along Lake Washington Blvd

Monday, January 14, 2008

Wow

January 2008

The house framing was fantastic to watch - basement...first floor...top floor...decks - and everyday the house takes on more shape and definition, and it gets more and more special



framing the garage, basement bedroom + crawlspace






next came the first floor bedroom, stairway





then the rest of the main floor



right before Christmas, they started framing the second floor



and then they put on the roof