Much has happened at the house the past 6 weeks or so. The roof has been covered with a torchdown material, as has the upper deck, and all the windows are installed, including the lift-fold doors in the dining room - which look fantastic!
Outside, the exterior siding has been going up - both the Hardie paneling and the Hardie planks; the cedar siding will come a little later.
and inside, the plumbing, electrical and low-voltage rough-ins are all done. Paul and I have brought over two chairs and a little table so that we can have a cup of coffee in the mornings or a glass of wine in the evenings when the workers aren't there. A little bit of heaven.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment